Opening walls and beams

The wall between the kitchen and the den, gone, with the ceiling still where you left it.

Taking out a wall is easy. Knowing whether it holds up the house is the job. We find out first: which way the joists run, what's above, and what's inside the wall. An engineer sizes the beam, and we build the temporary shoring, place the beam and rebuild the finishes.

What's in it

  • A look above and below to see what the wall carries

  • An engineer's letter and beam size

  • Temporary shoring while the wall is out

  • Rerouting of wires, pipes and ducts found in the wall

  • Ceiling, floor and wall repairs where the wall was

An old house wall opened to the studs with a wood door and a brick chimney beyond

What it doesn't include

Left out unless the contract says otherwise

  • New kitchen cabinets

    Opening the wall is one scope. A kitchen remodel that follows is another.

  • A beam without a drawing

    We don't size a beam by eye. The engineer's letter is part of the job.

  • Whole-floor refinishing

    We repair and blend the floor at the old wall's line. Refinishing the whole floor is optional.

What changes the cost

What moves the number

A wall with nothing in it is cheap. Most walls have something in them.

  • Flush or dropped

    A beam hidden in the ceiling costs more than one that shows below it, because the floor above needs to be reframed.

  • What's inside

    Ducts, drain lines and wiring in the wall must be moved, and each move has a cost.

  • The span

    The wider the opening, the bigger the beam, and the more posts that carry it down to the footing.

  • The floor and ceiling

    Matching an old hardwood floor or a plaster ceiling takes more labor than new drywall.

How it goes

The day the wall comes out

  1. 01

    Step 1: Shore and open

    Temporary walls go up on both sides, then the old wall comes apart in sections, with dust sealed off.

  2. 02

    Step 2: Set the beam

    The beam goes in, posts go down to the footing and we remove the shoring when the engineer's detail is built.

  3. 03

    Step 3: Reroute

    Wires, pipes and ducts come back in the new framing, inspected.

  4. 04

    Step 4: Patch and finish

    Drywall, ceiling and floor are repaired and painted so the opening looks like it was always there.

Permits and rules

When a beam needs a permit

A load-bearing wall removal needs a permit and a structural drawing in nearly every jurisdiction. We prepare both, and the inspector sees the beam and the posts before they're covered.

Who does what

  • We: drawing, permit and inspection

  • The engineer: sizes the beam and posts

  • You: sign the application and approve the finish plan

A bright empty room with a vaulted ceiling, a beam, a ceiling fan and French doors

Examples

Sample work

Showing 3 of 3

An old house wall opened to the studs with a wood door and a brick chimney beyond
Wall opened to the studs
A bright empty room with a vaulted ceiling, a beam, a ceiling fan and French doors
Room opened to a vaulted ceiling with a beam
A kitchen with exposed beams, white cabinets and French doors to the yard
Kitchen opened to the yard

Sample photos.

Questions

Walls and beams

How do I know if a wall is load-bearing?

We look at which way the joists run and what is above and below. An engineer confirms it in writing before we price the work.

Will the beam show?

It can be hidden in the ceiling or show below it. Hidden usually costs more. We show you both on paper.

How messy is it?

We seal the work area with plastic and run a filter, and clean at the end of every day, but a wall coming out is not quiet.

How long is the opening in the house?

The wall comes out and the beam goes in within a few working days, then finishes follow.

Which wall?

Send a photo or book a site visit, and we'll tell you whether it's carrying anything.