Most intown lots slope, have big trees and sit close to a neighbor. We start with the lot, because it decides where the room can go before the family decides what it's for. Then we draw, permit and build it: foundation, frame, roof tie-in, wiring, plumbing, heating and cooling, and finishes.

What's in it

  • Lot check: setbacks, trees, slope and where the water goes

  • Foundation to suit the site, slab or crawl space

  • Framing, roof tie-in and matching the existing siding or brick

  • Wiring, plumbing and the heating and cooling for the new room

  • Windows, floors, trim and paint to a finish schedule you approve

A brick and wood-sided split-level house with a landscaped front yard

What it doesn't include

Left out unless the contract says otherwise

  • Landscaping beyond the work area

    We restore what we disturb. New beds, patios and fences are a separate conversation.

  • Furniture and window treatments

    The room is finished and painted. What goes in it is yours.

  • Fixes hidden in the existing house

    Old wiring or rot we find while connecting is priced when we see it, with a photo, in a change order.

What changes the cost

Four things that move the number

Square footage is the smallest of them.

  • The foundation

    A slab on a flat lot is simple. A crawl space on a slope with a retaining wall is a different job.

  • The roof tie-in

    A simple extension of the ridge is cheap. A valley and a new pitch over old framing is not.

  • What's inside the room

    A bedroom is a different cost from a kitchen or a bath, because of pipes and cabinets.

  • Heating and cooling

    Sometimes the old system can carry the new room. Often it can't, and a new zone is part of the job.

How it goes

What the build looks like

  1. 01

    Step 1: Site protection

    Tree fencing, a dumpster, a path to the back and a temporary power pole. Your yard has a clear working edge from day one.

  2. 02

    Step 2: Foundation and frame

    Footings, then floor, walls and roof. The framing inspection happens before anything is covered.

  3. 03

    Step 3: Dry-in and systems

    Roof, windows and house wrap go on, then wiring, plumbing and ducts, then insulation, each inspected.

  4. 04

    Step 4: Finishes and connection

    Drywall, trim and paint, then we open the wall between the old house and the new room last.

Permits and rules

Setbacks, trees and review

A rear or side addition needs a building permit, and most intown lots have a setback or tree rule that shapes it. Some streets also have design review. We check which apply before you pay for construction drawings.

Who does what

  • We: lot check, drawings, permit application and inspections

  • You: sign the application and choose finishes on the schedule

  • The city or county: reviews drawings and inspects each stage

An empty room with hardwood floor, French doors, green walls and a built-in shelf unit

Examples

Sample work

Showing 3 of 3

An empty room with hardwood floor, French doors, green walls and a built-in shelf unit
Family room addition, French doors to the yard
A sunroom addition with a ceiling fan, a tile floor, a dining table and a sitting area
Rear sunroom with a dining corner
Two-story house framing with sheathing, scaffold and a red dumpster on a sunny day
Framing and dry-in on a rear addition

Sample photos.

Questions

Rear and side additions

Can I live in the house during the build?

Usually, yes. The new room is built outside the old walls, and we open the connection at the end. You'll hear us and see us, and we keep a clear path to the back door.

How do you match the brick or siding?

We take samples to the supplier first. Sometimes a match is close, and sometimes we use a trim detail or a change of material to make the new room look planned.

Will the existing heating and cooling handle the new room?

We run the numbers before drawing. If it can't, we add a zone or a second system in the plan, so it isn't a surprise in month three.

What if the lot is too tight?

Then we say so at the site visit, with the setback on the drawing. Sometimes a smaller footprint or a second story fits where a rear addition doesn't.

Is there room for a room?

We'll walk the lot, check the setbacks and give you a straight answer.