Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Residential-Basic Contractor · GA License no. 000000Verify(404) 555-0104

How pricing works

An addition has no standard price. Here is what sets yours, in the order you'll ask.

  • What decides the price

    Five things move an addition more than its size does.

    • The foundation: slab, crawl space or a basement

    • How the new roof meets the old

    • How many walls come out of the existing house

    • Kitchens and baths cost more than bedrooms

    • Windows, floors and fixtures you choose

  • What the estimate includes, and what it doesn't

    Scope, allowances and the schedule are in. Hidden conditions and things you choose after signing are not.

    • In: drawings listed by sheet, permits, demolition, framing, systems, finishes to the allowances

    • In: who is on site, and the order of the work

    • Out: furniture, landscaping, appliances you supply

    • Out: anything hidden until the wall is open

  • What the design fee covers

    Measured drawings, layouts, construction drawings and the permit set. It is its own line in your contract, and the contract says whether it is credited toward the build.

  • How and when you pay

    In stages tied to finished work, written into the contract, with the schedule shown at the first visit. Georgia rules apply.

  • If the job changes

    Changes are priced in writing before the work happens: the new scope, the cost and the effect on the schedule.

  • When you get the number

    After the drawings. The construction price is in writing before any construction deposit.

Why no square-foot number

Why this page prints no price per square foot

Published figures for additions disagree by a factor of two or more, because the same square foot can be a slab bedroom or a second-floor kitchen. A number here would tell you nothing about your house.

What we can do is write down what drives the cost, show you the drawings and put a number on them before you commit to the build. If a number on this page would have helped you decide whether to call, ask for the design-fee amount. It is the first price we can give you honestly.

Sample change order

What a change order looks like

One page, in this order.

  • 01

    What we found

    A photo and a sentence: an old drain line under the new floor, say.

  • 02

    What we propose

    The fix, in plain words, and who does it.

  • 03

    What it adds

    The cost, and the days it moves the schedule.

  • 04

    Your decision

    Sign to proceed, or say no. Nothing changes until you sign.

Ask for the design-fee amount

The site visit comes first. The design fee is quoted at the end of it.